General Requirements
Do not work with power on during installation.
Personal Safety

1.2 Personnel Requirements

Issue 03 (2020-09-15)
D ANGER
not limited to moving equipment, operating equipment and cables, inserting
connectors to or removing connectors from signal ports connected to outdoor
facilities, working at heights, and performing outdoor installation) in harsh
weather conditions such as lightning, rain, snow, and level 6 or stronger wind.
foam, plastics, and cable ties from the equipment area.
and turn on the
building on
in any case.
and relevant local standards.
installation in a timely manner. Equipment with scratches cannot be exposed
to an outdoor environment for a long period of time.
operations on the equipment, immediately stop the operations, report the
case to the supervisor, and take feasible protective measures.
thorough training, understand all necessary safety precautions, and be able to
correctly perform all operations.
professionals or trained personnel are allowed to install,
operate, and maintain the equipment.
professionals are allowed to remove safety facilities and inspect
the equipment.
personnel, and professionals, should possess the local national required
in special operations such as high-voltage operations, working
at heights, and operations of special equipment.
Copyright © Huawei Technologies Co., Ltd.
immediately leave the building or the equipment area,
alarm bell or make an emergency call. Do not enter the