Procedure
Step 1 Connect signal cables to corresponding signal connectors.
Issue 03 (2020-09-15)
Figure 5-24 Connecting cables to the smart power sensor (balanced
three-phase grid connection)
NO TE
system through a Smart Dongle.
point control function to achieve zero export.
connected to a smart power sensor.
the grid-tied point control function, they need to be connected to a three-phase
smart power sensor to control the total three-phase power.
inverter installed with the Smart Dongle.
NO TICE
core should be cut
that the outer diameters of the signal cables are the same.
Copyright © Huawei Technologies Co., Ltd.
from the protection layer.