Wall-Mounted Installation - Huawei SUN2000-(2KTL-6KTL)-L1 User Manual

Hide thumbs Also See for SUN2000-(2KTL-6KTL)-L1:
Table of Contents

Advertisement

SUN2000-(2KTL-6KTL)-L1
User Manual

4.5.1 Wall-Mounted Installation

Procedure
Step 1 Determine the positions for drilling holes using the
the positions of mounting holes using a level, and mark the positions with a
marker.
Step 2 Secure the mounting bracket.
When drilling holes, avoid the water pipes and power cables buried in the wall.
Figure 4-8 Expansion bolt composition
(1) Bolt
(4) Flat washer
Issue 03 (2020-09-15)
D ANGER
NO TE
M6x60 expansion bolts are delivered with the SUN2000. If the length and amount of the
bolts do not meet installation requirements, prepare M6 stainless steel expansion bolts by
yourself.
NO TICE
anti-dust mask when drilling holes.
the holes are inaccurately positioned, drill holes again.
the nut, spring washer, and
not be securely installed on the wall.
bottom.
Copyright © Huawei Technologies Co., Ltd.
(2) Nut
(5) Expansion sleeve
washer. Otherwise, the mounting bracket will
washer of the expansion bolt at the
4 System Installation
template. Level
(3) Spring washer
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents