1) Remove the coffee machine from its parcking and check that it has not been damaged.
2) Place the appliance on a stable top, close to the mains sockets and water line connections. The
machine's uppermost surface must be at least 1,5 m off the ground. The machine must be installed in
a horizontal position. The inclination of the support surface must not be greater than 1°. To ensure
normal operation, the machine must be installed in places where the ambient temperature is between
+5°C and +32°C and humidity does not exceed 70%. Do not use water jets or install in places where
water jets are used. Check that the voltage of your mains supply corresponds to that indicated in the
technical specifications.
3) Remove the upper cover grid (12), take out the water
tank (located inside the machine) and rinse it (Photo 1).
4) Fill the tank with approx. 3 litres clean water, put it
back, connect the water softener and insert the small
silicone tubes. Close the upper cover grid (12) on the
machine.
5) Before start-up the fitter must make sure the ma-
chine has been properly connected to the electrical and
earthing systems involved and check the efficiency of
protection from direct contact.
In Europe connect the approved cord H05VV-F 3G 1.5 mm with the Schuko plug to the electricity
supply.
In USA-Canada connect the approved cord Type SJTO, rated 3x14 AWG, 300 V, 105°C with the
NEMA 5x15P plug to the electricity supply.
IT IS STRICTLY FORBIDDEN TO USE THE MACHINE WITHOUT EFFEC-
TIVE SAFE EARTHING.
Before turning on the machine it is advisable that you check that there is water inside the
rear tank under the cup shelf (12).
1) Press the ON/OFF power switch (5) to the left.
The power on red indicator light (6) comes on.
2) The green warning light (4) comes on and the
heating element starts heating the water.
You must dispense water (14) for 5 seconds so as to
eliminate any air bubbles from the thermosyphon
circuit and for better thermal compensation.
3) Wait approximately 10-15 minutes to allow the
machine to reach its operating temperature.
4) When the green warning light (4) goes out the set
machine temperature has been reached. The red indicator light (6) will be always light (tension on the
electrical circuit).
NB: In case of first use, maintain the machine at temperature (without deliver water and coffee) for
about 2 hours. It is recommended to deliver in a jug at least 0.5 litres of water in order to allow its
recirculation (refer to chapter 8). Let the water flow out the delivery pipe (14) for 30 seconds.
5) If there is no water in the rear tank, all the electrical and water functions will stop, while the red
indicator light (6) remains on. Upon filling the tank with water, the microswitch located under the tank
will re-activate all the functions.
13
5. INSTALLATION
6. MACHINE IGNITION
Need help?
Do you have a question about the PERFETTA and is the answer not in the manual?