Placing Wave Bioreactor Units In The Cabinet - GE WAVE Cabinet 20 User Manual

Table of Contents

Advertisement

4.1 Placing WAVE Bioreactor units in the cabinet

Introduction
When WAVE Bioreactor units are placed in the cabinet, the top tray should not be
attached. First place the WAVE Bioreactor unit (see instruction below), then attach the
tray with connections.
WAVE Cabinet 20/50 User Manual 28-9651-86 AA
WARNING
Disconnect power. Always disconnect power from the instrument
before performing any installation or maintenance task.
WARNING
Heavy object. Two people are required to lift a WAVE Bioreactor
unit safely into the WAVE Cabinet.
4.1 Placing WAVE Bioreactor units in the cabinet
4 Installation
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wave cabinet 50

Table of Contents