Download Print this page

Walinga CENTRAL-VAC AIR-PURGE Installation Manual page 16

Advertisement

Accessory Wiring Instructions
See wiring diagram in panel for detailed wiring instructions.
If you have any questions, please contact your Walinga representative.
1. Remote Start/Stop
(a) Remote Start to be wired between terminal 5 and 6.
(b) Remote Stop
1. Remove jumper between terminal 4 and 3.
2. Remote Stop to be wired between terminal 4 and 3.
2. Purge Circuit
(a) Timer Board Power Connection to be wired between terminal 7 and 2. (Voltage
120VAC)
3. High-Level Sensor
(a) High-Level Sensor (Normally open) to be wired between terminal 8 and 3. (Voltage
120VAC)
4. Auxiliary Stop Sensor
(a) Remove jumper between terminal 9 and 3.
(b) Auxiliary Stop Sensor (Normally open) to be wired between terminal 9 and 1a.
(Voltage 120VAC)
5. Open Gate Solenoid
(a) Open Gate Solenoid to be wired between terminal 10 and 2. (Voltage 120VAC)
6. Close Gate Solenoid
(a) Close Gate Solenoid to be wired between terminal 11 and 2. (Voltage 120VAC)
Central-Vac Air-Purge Installation Manual 09292020
R-1: March 17, 2018

Advertisement

loading