 Piping Requirements
 Every system is different, built to suit the
customer.
 A typical system will include piping layout/
system design drawings provided by either
approved project engineering staff or qualified
Walinga personnel.
 All piping installed must be properly supported.
o When installing the support points,
ensure that there is enough strength to
allow for a full pipe line, should the
system become plugged.
o One support point for every 15' of pipe
line is recommended.
 Ensure that the main lines are as straight as
possible to maintain maximum conveying rate.
 Space the inlets and the inlet piping, or at a maximum of
40' apart, in accordance with piping layout drawing
provided.
 When installing the inlet lines, ensure that the Y elbows
enter from either the side or the top of the main pipe line.
The Y must also follow the flow of the product and air
stream.
 All the piping should be within 400' of the main Central
Vac system to maintain product air speed and avoid
plugging.