Exhaust; Vacuum Pump Installation; Location Of Switch On/Off Button - UniTemp RSS Series Operation Instructions Manual

Programmable inert gas vacuum plate, reflow solder system
Table of Contents

Advertisement

2.4 Storage of process data
The RSS-110-S reflow solder system can store process data on a USB 2.0 memory
stick. The stick has to be put in the USB 2.0 socket on right side of touch panel (see
Figure 1). For network integration of RSS-110-S reflow solder system it has to be con-
nected to a computer network using the network socket (at bottom side of touchpanel
module) and being integrated into a computer domain. Please consult the IT administra-
tor!
The USB 2.0 memory stick also allows the storage of exported programs from touch
panel and later import back to touch panel.
2.5 VNC Server
A license free VNC server is installed on the RSS-110-S system. Connecting the RSS-
110-S to a computer network or to a PC allows remotely controlling the system through
TCP/IP protocol by using a VNC client. The IP address of touch panel is 192.168.178.90
(this IP address must not be changed!), the password for VNC sessions is "admin".

2.6 Exhaust

The ventilation outlet (DN16) is located at the rear side of connector block (see no. 8 in
Figure 2). If possible operate with the system beneath an exhaust (e.g. flow-box) or
connect the ventilation outlet directly with ventilation, so that steam formation during the
processes will not cause smells.

2.7 Vacuum pump installation

In case vacuum option is ordered, the pneumatically operated vacuum valve (with DN
16 KF flange) is already connected to the rear side of RSS-110-S reflow solder system.
The flexible metal hose (provided with the delivery) has to connect the vacuum pump
with the RSS-110-S system.
The vacuum pump (Ilmvac MP 601 Tp) has to be electrically connected to the connector
at the rear side of RSS-110-S system.

3 Location of switch on/off button

On the rear side of RSS-110-S reflow solder system the button for switching ON and
OFF the system is located. Before switching on make sure that all previous items of this
chapter have been effected and the devices are thus correctly connected. Vacuum
pump and water cooling have to be switched on. Make sure that soldering chamber and
hot plate are freed and clean.
UniTemp GmbH • Luitpoldstr. 6 • D-85276 Pfaffenhofen • +49 (0) 8441 787663 • www.unitemp.de • info@unitemp.de
Operation Instructions RSS-110-S En Ver. 06.2016
Page 10 of 13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rss-110-sRss-110-s/us

Table of Contents