Airtecnics ECM 1000 A FC Accompaniment To The Installation, Operation And Maintenance Manual

Airtecnics ECM 1000 A FC Accompaniment To The Installation, Operation And Maintenance Manual

Air curtain with disinfection technology

Advertisement

ACCOMPANIMENT TO THE INSTALLATION, OPERATION
AND MAINTENANCE MANUAL
Air curtain with disinfection technology
Please read the instructions carefully before installation.
Give this manual to the end user.
Attention, Danger, Safety Warning!
Danger of injury!
Attention! Wear protective glasses
UV-A: Ultraviolet radiation
SECURITY ADVISE SYMBOLS
High voltaje or electric current Hazard!
Attention! Do not stand under the load:
Heavy weight.
Important information
WELDOM20010-R0 (04/03/21)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ECM 1000 A FC and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Airtecnics ECM 1000 A FC

  • Page 1 ACCOMPANIMENT TO THE INSTALLATION, OPERATION AND MAINTENANCE MANUAL Air curtain with disinfection technology Please read the instructions carefully before installation. Give this manual to the end user. SECURITY ADVISE SYMBOLS Attention, Danger, Safety Warning! High voltaje or electric current Hazard! Attention! Do not stand under the load: Danger of injury! Heavy weight.
  • Page 2: Table Of Contents

    ÍNDICE OUTSTANDING INSTALLATION INFORMATION .................... 3 Air curtains with Wellisair technology (OH·)....................3 Air curtains with Photocatalytic technology (FC) .................... 4 TRANSPORT AND STORAGE .......................... 5 OPERATING INSTRUCTIONS .......................... 6 Air curtains with Wellisair technology (OH·)....................6 Air curtains with Photocatalysis technology (FC) .................... 7 ESQUEMAS ELÉCTRICOS ..........................
  • Page 3: Outstanding Installation Information

    OUTSTANDING INSTALLATION INFORMATION Disinfection air curtains are divided in two groups: Wellisair technology (OH·) and Photocatalysis technology (FC). To know the installation, functioning and maintenance of double technology air curtains (OH+FC), read both manual categories. For the FC air curtains, just read the corresponding category. Air curtains with Wellisair technology (OH·) Air curtains with Wellisair technology ONLY can be installed in HORIZONTAL position, because inside there is...
  • Page 4: Air Curtains With Photocatalytic Technology (Fc)

    The air curtains include the Advanced Clever control installed in the air curtain’s housing (the position changes depending on the model), it only needs the TFT connection and the accessories which the user wants to use (temperature sensors, door contact, ModBus, etc): Advanced Clever Control includes an air quality sensor to monitor on the TFT screen the air pollution level that enters to the air curtain.
  • Page 5: Transport And Storage

    TRANSPORT AND STORAGE ¡Attention! Heavy load. Do not stand under the suspended equipment during transport or assembly Store in a dry place protected from the elements. If the packaging is open, cover the purifier to protect it from dust. Do not step on or place heavy load son it to avoid damage to the material. Storage temperature between -20ºC and +40ºC.
  • Page 6: Operating Instructions

    OPERATING INSTRUCTIONS For safety, air curtains never have to be stopped by disconnecting them from the main supply, always through the controller and wait for 10 minutes at least to disconnect the main supply. In case to not follow these instructions, the internal parts of the air curtain can be damaged.
  • Page 7: Air Curtains With Photocatalysis Technology (Fc)

    Air curtains with Photocatalysis technology (FC) When the air curtain is running, the passive (air that goes through the fans) purification and disinfection is active. Includes a standard five speed control (see enclosed air curtain manual) Optional, Advanced Clever Control with a specific disinfection program to monitor the disinfection and the kind of functioning.
  • Page 8: Esquemas Eléctricos

    Incorporates a 4-level air quality sensor by Volatile Organic Compounds (VOCs). It is installed inside the Advanced Clever Control and monitors the air quality that goes through the air curtain as: Optimal Regular Good ESQUEMAS ELÉCTRICOS Find attached the following electrical wiring diagrams: Disinfection OH+FC: •...
  • Page 9 (9) Accompaniment manual – Disinfection air curtains...
  • Page 10 (10) Accompaniment manual – Disinfection air curtains...
  • Page 11 (11) Accompaniment manual – Disinfection air curtains...
  • Page 12 (12) Accompaniment manual – Disinfection air curtains...
  • Page 13 (13) Accompaniment manual – Disinfection air curtains...
  • Page 14 (14) Accompaniment manual – Disinfection air curtains...
  • Page 15 (15) Accompaniment manual – Disinfection air curtains...
  • Page 16: Technical Specifications

    TECHNICAL SPECIFICATIONS (16) Accompaniment manual – Disinfection air curtains...
  • Page 17 (17) Accompaniment manual – Disinfection air curtains...
  • Page 18 (18) Accompaniment manual – Disinfection air curtains...
  • Page 19 (19) Accompaniment manual – Disinfection air curtains...
  • Page 20 (20) Accompaniment manual – Disinfection air curtains...
  • Page 21 (21) Accompaniment manual – Disinfection air curtains...
  • Page 22 (22) Accompaniment manual – Disinfection air curtains...
  • Page 23 (23) Accompaniment manual – Disinfection air curtains...
  • Page 24: Maintenance Instructions

    MAINTENANCE INSTRUCTIONS For safety, before any cleaning, disconnect power supply using the controller. It is forbidden to open the service door (risk of electrical discharge and being trapped in fans). Service and maintenance should be done only by introduced and qualified workers.
  • Page 25 3. Identify the OH· reaction chambers Depending on the length, the air curtains incorporate one or two chambers (see “Outstanding installation information” section) 4. Unscrew the empty cartridge 5. Take the new cartridge and remove the cap 6. Screw the cartridge in 7.
  • Page 26: Repairs And Replacements

    REPAIRS AND REPLACEMENTS Installation and electrical connections must be done by qualified workers and following these instructions. Before any repairs are undertaken, please: • Inform people that there is work in progress. • Disconnect the power supply and protect the thermal magnet (so nobody can restart it accidentally).
  • Page 27 Model: Zen Unscrew the fixing screws Disconnect the wires from the terminal block placed on the reaction chamber lateral (27) Accompaniment manual – Disinfection air curtains...
  • Page 28: Declaration Of Conformity

    DECLARATION OF CONFORMITY (28) Accompaniment manual – Disinfection air curtains...

Table of Contents