System Disinfection; Cleaning The Quartz Sleeve - SpringWell SPRW-UV4-2 Operation & Installation Instructions

Table of Contents

Advertisement

Step 13: Plug the lamp connector into the lamp. Note the
keying for proper alignment (see Figure 8a, 8b). Insert the
lamp connector into the gland nut and turn the connector
approximately ¼ turn to lock the connector to the gland nut as
in Figure 9.
Step 14: Tighten the captive ground screw to the ground lug
on the UV reactor to ensure proper grounding(Figure 10).
Step 15: Your system is now ready to be plugged into the
appropriate GFCI protected outlet. Refer to the following
section before any water is allowed to flow through the system.

System Disinfection

With a new installation, or any time the UV system is shut
down for service, without power, or is inoperative for any other
reason, the lines in the home or facility could be contaminated.
Use the following steps to fully disinfect the lines throughout
the entire home or facility.
Step 1:
Check for and remove any "dead ends" in the lines
throughout the home as these can harbor bacteria. Plug in the
UV system and wait until it is ready for operation.
Step 2:
Remove the filter cartridge from the last sump and fill
it with 1-2 cups of household bleach (most are 5.25% chlorine).
Replace the sump and slowly turn on the water supply.
Step 3:
At a water outlet, run the water until bleach can
be smelled. Repeat this for all faucets, toilets, shower heads,
refrigerators, outdoor taps, the washing machine, dishwasher,
etc. at the home or facility. Once finished, wait a minimum of 30
minutes before continuing.
Step 4:
Reinstall the filter cartridge into the sump and flush
the chlorine solution by opening all faucets until chlorine can
no longer be detected. Your home has now been completely
disinfected with your UV system ready to inactivate any
microorganisms that enter the home.

Cleaning the Quartz Sleeve

Depending on the water quality, the quartz sleeve may require
periodic cleaning. At a minimum, the quartz sleeve should be
cleaned on an annual basis. The following steps outline a basic
cleaning procedure.
Step 1:
If a by-pass assembly is installed, shut the inlet valve
off to prevent water flow through the system. Otherwise, turn
off main water inlet valve (and/or turn off the water pump).
Step 2:
Disconnect power cord of UV system from electrical
outlet.
Figure 8a. Standard
Output UV Lamp
Connection
Figure 8b. High Output
UV Lamp Connection
Figure 9. Lamp
Connector
Figure 10. Ground
Screw Connection
1 1 |
P a g e

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPRW-UV4-2 and is the answer not in the manual?

Questions and answers

Related Products for SpringWell SPRW-UV4-2

Table of Contents