Preparing For Installation - USA Lab UHC Series Manual

Recirculating heater chiller
Hide thumbs Also See for UHC Series:
Table of Contents

Advertisement

4 Preparing for Installation

1. Please refer to the packing list above to check whether the components and parts are included. If there
are any missing parts, please contact us immediately.
2. Remove any residue before assembly and keep all surfaces clean.
3. Tools that might be needed in the installation include: large adjustable wrench.
4. A professionally installed receptacle. Requirements listed below by model. See Specs in section 1.3.
UHC-10/40 NEMA L6-30P 220V 30A
UHC-20/40 NEMA L6-30P 220V 30A
UHC-50/40 NONE Hardwired Installation ONLY, 220V 40A on a quick disconnect panel.
UHC-10/40:
UHC-20/40:
UHC-50/40:
6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UHC Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Uhc-10/40Uhc-20/40Uhc-50/40

Table of Contents