Dual Manual Fold "U" Handrail (With Shield); Instructions - Braun UVL 603A Owner's Manual

Uvl series under vehicle wheelchair lifts
Table of Contents

Advertisement

Dual Manual Fold "U" Handrail (with Shield) Instructions
Folding "U" handrails (with safety
shield) are manually operated.
The handrails rest on the platform
when the lift is not in use. The
handrails must be folded down to
the platform (horizontal position)
before stowing the lift.
To Deploy Handrails:
1. Lift front
(right)
handrail to
vertical
latched
position. Be
certain latch
is engaged.
To Stow Handrails:
Inboard
Before stowing lift:
Roll Stop
1. Fold down
inboard roll
stop (bridge
plate).
2. Lift round
latching knob to
disengage latch
and fold rear
(left) handrail
down to plat-
form (horizontal
position).
Page 14
Note: The bridge plate (inboard
roll stop) must be folded down
to the platform (horizontal posi-
tion) before the handrails are
folded down.
The handrails are lifted to the
2. Lift rear (left)
handrail to
vertical
latched
position. Be
certain latch
is engaged.
Latch
Knob
Latch
Knob
3. Lift round
latching knob to
disengage latch
and fold front
(right) handrail
down to plat-
form (horizontal
position).
vertical position and locked in
position with a latch that auto-
matically engages the platform
bracket when fully raised. Lifting
the round knob located on the
vertical handrail tube disengages
the latch.
W ARNING
Fold handrails down
before stowing lift.
Failure to do so may
result in serious
bodily injury and/or
property damage.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents