Dual Stationary Handrail Instructions
Stationary handrails remain in the
upright (vertical position) at all
times. Handrail access slots are
provided in the lift housing cover.
Access slots are incorporated in
the vehicle floor or stairwell
during lift installation procedures.
The handrails travel in and out of
Lift Housing
Cover with
Access Slots
Access Slot
Dual Manual Fold "P" Handrail Instructions
Folding "P" handrails are manu-
ally operated. The handrails rest
on the platform when the lift is not
in use. The handrails must be
folded down to the platform
(horizontal position) before
stowing the lift. The handrails are
Deployed
"P" Handrails
Latch
Knob
Latch Knob
the access slots as the platform
carriage assembly retracts and
extends. Keep clear of the
handrail access slots during lift
operation.
Stationary
Handrails
Access
Slot
lifted to the vertical position and
locked in position with a latch that
automatically engages the
platform bracket when fully
raised. Lifting the round knob
located on the vertical handrail
tube disengages the latch.
Stay clear of handrail
access slots during
lift operation. Failure
to do so may result in
serious bodily injury.
Keep clear of handrail access
slots during lift operation.
Fold handrails down
before stowing lift.
Failure to do so may
result in serious
bodily injury and/or
property damage.
Stowed
"P" Handrails
W ARNING
W ARNING
Page 13