General Supply Conditions; Receipt, Unpacking And Storage; Equipment Responsibility - Kongsberg cPAP MKII Instruction Manual

Hide thumbs Also See for cPAP MKII:
Table of Contents

Advertisement

cPAP MKII

General supply conditions

Receipt, unpacking and storage

Upon accepting shipment of the equipment, the shipyard and/or the dealer must ensure
that the delivery is complete and inspect each shipping container for evidence of physical
damage.
Detailed descriptions and procedures for the receipt, unpacking and storage of the
equipment are found in the chapter for Equipment handling.

Equipment responsibility

Unless otherwise stated in the contract, the shipyard doing the installation and/or
equipment dealer becomes fully responsible for the equipment upon receipt.
The duration of responsibility cover:
• The period of time the equipment is stored locally before installation
• The entire installation process
• Commissioning
• The period of time between commissioning and the final acceptance of the equipment
by the end user or owner
Unless other arrangements have been made in the contract, the Kongsberg cPAP MKII
warranty period (as specified in the contract) begins when the acceptance documents
have been signed.
9
447979/A

Advertisement

Table of Contents
loading

Table of Contents