Table Of Contents - Flowserve IPS-Beacon VB-105 Installation Operation & Maintenance

Condition monitoring and alert system for vibration and temperature
Table of Contents

Advertisement

CONTENTS
1 INTRODUCTION AND SAFETY ........................... 3
1.1 General ............................................................ 3
1.2 CE Marking and approvals .............................. 3
1.3 Disclaimer ....................................................... 3
1.4 Copyright ......................................................... 3
1.5 Duty conditions................................................ 3
1.6 Safety .............................................................. 4
1.7 Specific machine performance ........................ 4
2 TRANSPORT AND STORAGE ............................. 4
2.2 Handling .......................................................... 5
2.3 Storage ............................................................ 5
2.5 Disposal Instructions ....................................... 5
3 DESCRIPTION ...................................................... 5
3.1 Configurations ................................................. 5
3.2 Alarm mode ..................................................... 6
3.4 Power-up module (PUM) ................................ 7
4 MAINTENANCE ..................................................... 7
4.1 Tools required ................................................. 7
4.2 Turning unit on/off ........................................... 7
4.3 Low battery ...................................................... 7
5.1 User configurable settings .............................. 7
5.2 Connecting to IPS Beacon unit ....................... 8
5.3 Setting alarm set points .................................. 8
5.5 Reloading factory configuration ...................... 8
6 INSTALLATION ..................................................... 8
6.1 Tools required ............................................... 10
6.2 Unpacking ..................................................... 10
6.3 Preliminary operational check ....................... 10
6.4 Attachment options ....................................... 10
6.5 LED Indications ............................................. 10
Page 2 of 16
IPS BEACON ENGLISH 26999949 03-13
Page
7 ACTIVATE THE IPS-BEACON ............................10
7.1 Power-up module (PUM) ...............................10
8 PARTS LIST AND DRAWINGS ...........................11
9 CERTIFICATION ..................................................11
10 TROUBLE-SHOOTING GUIDE .........................11
10.1 No flashing LEDs .........................................11
10.2 Inaccurate or missing data ..........................12
11 DECLARATION OF CONFORMITY ..................13
Page
flowserve.com

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IPS-Beacon VB-105 and is the answer not in the manual?

Table of Contents