Dirna bycool blue line REVOLUTION 12 V. ADR Mounting Instructions page 38

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 22
REVOLUTION
EN
Place the filler plug in the tank, cut to
26
100mm; insert "T" and connect the pipe
with the smaller diameter to this, mark
with white tape and check that the
curve radius is big enough to avoid
constriction.
Connect sheathed wiring to the
27
evaporative boxes and water inlet pipe.
A. Connect the impulsion pipe to the
pump which comes from the evaporative
unit.
B. Connect pump wiring and level.
Connect the battery wiring as indicated.
28
A
Bomba de agua
38
dirna
Flotador
, s.a.
26
27
B
28

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bycool blue line revolution 24 v. adr

Table of Contents