Survey And Construction; Installation - probst FLIEGUAN-HANDY FXH-25 Operating Instructions Manual

Vacuum hand laying device
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 18

Installation

2.2

Survey and construction

4
1.
Connecting cone
2.
Elastic rope
3.
Handle
4. Release
5.
Rubber foam
6. Alternativ connecting cone (optional)
3
Installation
Before the installation, make sure that the present vacuum generator is suitable for usage with the laying
device.
If the cone shoultn't fit, other cones are available by request (see Chapter „Survey and construction").
The vacuum generator must be turned off during the installation.
5850.0001
1
2
3
5
V3
8 / 12
6
GB

Advertisement

Table of Contents
loading

Table of Contents