120V Hardwiring Installation (Nefl42/50/60/74/100Chd-1 Only) - Napoleon Alluravision Series Installation And Operation Manual

Hide thumbs Also See for Alluravision Series:
Table of Contents

Advertisement

Available languages

Available languages

electrical information
EN
3.2

120V hardwiring installation (NEFL42/50/60/74/100CHD-1 only)

1. Remove the securing screws from the junction box
cover plate, located on the left side, at the back
of the appliance. Discard the original junction box
A
cover plate and set screws aside.
2. Loosen the securing screws in the terminal block
to remove the power cord.
3. Install the strain relief into the junction box cover
plate (supplied), and feed the supply wires through
the 7/8" (22mm) hole. Use minimum 14AWG/2.
4. Insert Green or bare copper wire to the designated
G Terminal. Tighten the screw.
5. Insert White wire to the designated N Terminal. Tighten the screw.
6. Insert Black wire to the designated L1 Terminal. Tighten the screw.
7. Make sure all connections are tightened properly.
8. Reinstall the junction box cover plate using the screws removed in step 1.
A
18
W415-2841 / D / 11.25.20
WHITE (N)
BLACK (L1)
RED (L2)
GREEN (G)
HARDWIRING DIAGRAM
SCHÉMA DE BRANCHMENT
WHITE/BLANC (N)
BLACK/NOIR (L1)
RED/ROUGE (L2)
GREEN/VERT (G)
WHITE/BLANC (N)
BLACK/NOIR (L1)
RED/ROUGE (L2)
GREEN/VERT (G)
(N)
(L1)
(G)
PAR CÂBLE
120V
WHITE/BLANC (N)
BLACK/NOIR (L1)
GREEN/VERT (G)
240V
WHITE/BLANC (N)
BLACK/NOIR (L1)
RED/ROUGE (L2)
GREEN/VERT (G)
W385-2464 / A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nefl42chs-1Nefl50chs-1Nefl60chs-1Nefl74chs-1Nefl42chd-1Nefl50chd-1 ... Show all

Table of Contents