Maintenance Logbook - Lennox WA Series Installation, Operating And Maintenance

Air cooled chillers
Table of Contents

Advertisement

MAINTENANCE LOGBOOK

MAINTENANCE visit n° 1 (500H / 1000H)
Unit general control (corrosion, damages...)
Exchanger cleaning
Leak test done
Oil acidity test carried
Replacement of filter drier cartridge
Water filters cleans
Evaporator pressure drop
Water condenser pressure drop
Glycol concentration level
Unit operating parameters checked and in conformity
Fans currents level checked and in conformity
Compressors data
Operating hours
Current at 100% load
Comments et remarks:
MAINTENANCE visit n° 2
Unit general control (corrosion, damages...)
Exchanger cleaning
Leak test done
Oil acidity test carried
Replacement of filter drier cartridge
Water filters cleans
Evaporator pressure drop
Water condenser pressure drop
Glycol concentration level
Unit operating parameters checked and in conformity
Fans currents level checked and in conformity
Compressors data
Operating hours
Current at 100% load
Comments et remarks:
Installation - Operation - Maintenance manual (IOM) • AIR COOLED CHILLERS & SPLIT UNITS - 0105-E
Y / N
Value
Kpa
Kpa
%
CP1
CP2
TECHNICIAN
Name
Signature:
Y / N
Value
Kpa
Kpa
%
CP1
CP2
TECHNICIAN
Name
Signature:
Date
Comments
CP3
CP4
CP5
CLIENT
Name
Signature:
Date
Comments
CP3
CP4
CP5
CLIENT
Name
Signature:
CP6
CP6
• 73 •

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wah seriesRa seriesMcc seriesNah270dnm1m

Table of Contents