Operational Guidelines; Unpack Omnistand; Exercise Program Planning; Basic Operational Sequence - ACP OMNISTAND User Manual

Dynamic balance system
Table of Contents

Advertisement

12

Unpack OmniStand™

 Remove OmniStand™ from packaging
 Check OmniStand™ for all accessories/options and for transport damage
 Check if delivery is complete
 Inform supplier or forwarding agent immediately about any damage

Exercise Program Planning

The frequency and duration of exercise sessions on the OmniStand™ should be individually planned based on each
exerciser's health profile, status, and condition. Proper exerciser-specific exercise dosing with the OmniStand™ is
extremely important if improvements in balance, mobility, strength, cardiovascular performance, and endurance are
to be achieved. It is recommended that relative to exerciser-specific needs and capabilities, exercise sessions start at
an easier intensity and shorter duration. As exercisers demonstrate better exercise tolerance, progressive increases in
intensity and/or duration are recommended, dependent on each user's goals and health status.

Basic Operational Sequence

Risk of injury due to insufficient preparation!
Before starting any exercise, make sure that the OmniStand™ is properly assembled, and
fully operational.
Disinfect the OmniStand™ before every training.
Caution
Note: Markings on upper pipe frame and knee support simplify horizontal adjustment. Before every exercise
session, adjust settings of OmniStand™ to match the user's individual needs.
Lock transport castors with brake/wheel locks
Prevent OmniStand™ from moving as follows:
Before EVERY USE, lock all four transport castors with brake/wheel locks
Push down locking lever on transport castors with brake/wheel locks
Release transport castors with brake/wheel locks
To transport OmniStand™:
Release locking lever on transport castors with brake/wheel locks
Setting the height of the upper pipe frame
Note: A pneumatic spring supports the height adjustment
 Release winged screw B on first vertical pipe
 Set height using marks A
 Tighten winged screw B on first vertical pipe
 Repeat process to set height on second vertical pipe
 Make sure that height settings of left and right
vertical pipe are the same
COPYRIGHT © 2016, ACCELERATED CARE PLUS CORP., ALL RIGHTS RESERVED.

OPERATIONAL GUIDELINES

B
OMNISTAND™ USER MANUAL
A

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OMNISTAND and is the answer not in the manual?

Table of Contents