Wireline/Cord Deployment
Deployment
• Deploy your Levelogger and Barologger using an L5 Direct Read Cable for down-well
communication, or use an inexpensive wireline or Kevlar cord.
Note: For information on other types of installations, see the latest
Levelogger User
• Install the Barologger in a similar thermal environment as the Levelogger
• The Barologger should be suspended beyond the frost line and deep enough to avoid large
temperature fluctuations
• Ensure the Barologger location is vented to atmosphere
After Deployment
After deployment, make sure you do the following:
• Take a manual depth to water measurement after the well has stabilized (approximately
10 minutes)
• Take another manual depth to water measurement just before removing the Levelogger
from the well
Guide.
Well Caps
The Model 3001 2" (or 4" with Adaptor) Well Cap
Assembly provides a secure method of installing your
Levelogger using wireline/Kevlar cord or L5 Direct
Read Cables. A Support Hanger Bracket is available for
supporting and organizing down well wires or cords, or
for coiling extra L5 Direct Read Cable lengths.
- 8 -
Direct Read Deployment
Need help?
Do you have a question about the Levelogger 5 Series and is the answer not in the manual?