Devatec ELECTROVAP MC2 Technical Manual

Steam generator for hammam
Hide thumbs Also See for ELECTROVAP MC2:
Table of Contents

Advertisement

Technical manual
Steam generator for hammam
Pictures for illustrating purposes only

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ELECTROVAP MC2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Devatec ELECTROVAP MC2

  • Page 1 Technical manual Steam generator for hammam Pictures for illustrating purposes only...
  • Page 2 MC2 S LECTRO TEAM Contents Safety information Accreditation RoHS declaration Delivery contents Dimensions & weights Humidifier component part overview Wall installation Installation steps Step 1 - Placing and wall attachement 11-12 Step 2 - Water connection Step 3 - Steam nozzle positioning Step 4 - Steam &...
  • Page 3 It is recommended that the ElectroVap MC2 steam generator be kept in its transit packaging for as long as possible prior to maintenance. If the humidifier is to be put into storage prior to installation, it must be stored under cover and protected from physical damage, dust, frost, rain and humidity.
  • Page 4 OR HARM RESULTING FROM INCORRECT USE. Water The ElectroVap MC2 Steam Bath is designed to be used with mains, demineralized R/O with a minimum con- ductivity of 30 µs or softened water. On no account attempt to introduce any other fluid or chemical into the system.
  • Page 5 EN 60335-2-88: Low voltage : safety of electrodomestical devices and similar, concerning humidifiers EN 60204-1: Safety of machinery - Electrical Equipment of machines - Part 1 : General re- quirements Manufacturer’s name & address devatec 185 bd des Frères Rousseau 76550 Offranville - France Type of equipment Steam humidifier Model name &...
  • Page 6 MC2 S LECTRO TEAM RoHS declaration devatec sas 185 bd des Frères Rousseau 76550 Offranville - France Confirms that the ElectroVap ELMC steam generator is manufactured in compliance with the European regulations 2002/95/EU (RoHS). This guideline regulates after July 1 2006 the use of mercury, cadmium, lead (soldering processes), chrome VI as well as PBB and PBDE.
  • Page 7 Any loss or damage during delivery should be reported to carrier by registered letter within 3 working days and be advised to devatec or to authorized dealer. It is recommended that the ElectroVap Steam MC2 Bath be kept in its transit packaging for as long as possible prior to maintenance.
  • Page 8 MC2 S LECTRO TEAM Dimensions & Weight 41 4,31 21 4,5 ELMC ELMC 1 small 1 large cyl. cyl. 271 ,5 41 4 275,22 275,22 381 ,78 300,61 401 ,69 ELMC ELMC 2 cylinders 3 cylinders Dimensions in mm Weight in Kg Steam Drain Water...
  • Page 9 MC2 S LECTRO TEAM Humidifier component parts ELMC 5-30 humidifier split view Steam hose Water feed hose 12x16mm Hose clamp 16x25mm Overflow water hose 18x22m On/off rocker switch Stand-by lamp Grommet Drain cup (upper) Water inlet valve LCD display board Remote information board (option) Power contactor Main circuit board...
  • Page 10 Please read, heed and follow the enclosed information for the installation of the humidifier and the steam, water and electrical networks. For further technical assistance, feel free to call devatec. Failure to adhere to manufacturer’s installation recommendations will invalidate your warranty.
  • Page 11 When in operation, the rear panel becomes hot (60°C) so do not hang the generator on a heat sensitive surface. devatec steam generators have been developped to be hanged on wall. Before installation, make sure that the surface material is strong enough to hold the steam bath.
  • Page 12 MC2 S LECTRO TEAM Installation - Step 1 Installation on wall Nota : Use installation equipment and material appropriate to the surface on which the unit should be hanged . The dimensions mentioned underneath are for cabinets without doors. Method: Mark and drill the mounting holes for 6 mm screws (s.a.
  • Page 13 The ElectroVap MC2 Steam Bath can produce steam from 3 water qualities having the following characteristics : Town water or raw water : the water TH should be between 0 and 40°...
  • Page 14 MC2 S LECTRO TEAM Installation - Step 3 STEAM DISTRIBUTION NOZZLE Steam from the cylinder enters the hammam via a steam distribution nozzle. This nozzle is made of material designed to prevent scalding. In order to obtain optimum performance of your generator, it is recommended that these instructions be adhered to as far as possible.
  • Page 15 Installation - Step 3 Steam outlet We would recommend to use the steam hose from Devatec supply. NB : when the steam generator is started up for the first time, a smell of burning may be smelt especially when brand new hoses are installed. This is normal and will eventually dispel.
  • Page 16 Condensate draining The following drawing shows the water draining connections that should be made. 1. The devatec supplied steam hose should be used : ELMC 1 cylinder : 1m Ø25mm hose with 1 hose clamp (supplied). ELMC 2 cylinders : 1m + 1.2m Ø25mm hose with 2 clamps (supplied).
  • Page 17 MC2 S LECTRO TEAM Installation - Step 5 Temperature sensor A temperature sensor located inside the hammam measures the temperature value which is sent to the steam generator for command. Attachement • Bore a hole of Ø 25mm. • Pass the sensor cable through the hole from inside the hammam.
  • Page 18 MC2 S LECTRO TEAM Models & Optional features Time bath The model includes a push button, a 3 dry contact control board and a two-colour green/red lamp. When there is no Remote Control, a mere push on this button powers the steam generator for about 30 minutes (adjustable time). A red ligth is shown when the steam bath steams up and it turns green when it is ready for use.
  • Page 19 Check all electrical terminal screws at commissioning, after 50 hours operation and at every service thereafter. Take care : the ElectroVap MC2 Steam Bath electronic components are very sensitive to electrostatic shocks. Appropriate steps must be taken before any operation.
  • Page 20 MC2 S LECTRO TEAM Installation - Step 6 ELECTRICAL TABLES MC2 Steam Bath Generator in 2 X 220V - 50/60 Hz Imaxi Pmaxi Steam Torroidal Steam production ELMC Cylinder size Transformer (KG/Steam) ( A ) ( A ) ( KW ) diameter wiring 5,00...
  • Page 21 MC2 S LECTRO TEAM Installation - Step 6 MC2 Steam Bath Generator in 3 X 208V - 50/60 Hz Imaxi Pmaxi Steam Torroidal Steam production ELMC Cylinder size ( A ) ( A ) ( KW ) transformer (KG/Steam) diameter wiring 10,5 4,13...
  • Page 22 MC2 S LECTRO TEAM Installation - Step 6 MC2 Steam Bath Generator in 3 X 230V - 50/60 Hz Imaxi Pmaxi Steam Torroidal Steam production ELMC Cylinder size ( A ) ( A ) ( KW ) Transformer (KG/Steam) diameter wiring 10,5 4,13...
  • Page 23 MC2 S LECTRO TEAM Installation - Step 6 MC2 Steam Bath Generator in 3 X 400V - 50/60 Hz Imaxi Pmaxi Steam Torroidal Steam production ELMC Cylinder size ( A ) ( A ) ( KW ) Transformer (KG/Steam) diameter wiring 4,24 Small...
  • Page 24 MC2 S LECTRO TEAM Installation - Step 6 MC2 Steam Bath Generator in 3 X 480V - 50/60 Hz Imaxi Pmaxi Steam Torroidal Steam production ELMC Cylinder size ( A ) ( A ) ( KW ) Transformer (KG/Steam) diameter wiring 4,25 Small...
  • Page 25 MC2 S LECTRO TEAM Installation - Step 6 MC2 Steam Bath Generator in 3 X 600V - 50/60 Hz Imaxi Pmaxi Steam Torroidal Steam production ELMC Cylinder size ( A ) ( A ) ( KW ) Transformer (KG/Steam) diameter wiring 4,41 Small...
  • Page 26 All works concerned with electrical installation must be carried out by a skilled and qualified personnel. Make sure that all incoming power supplies are isolated before installation and maintenance of the ElectroVap MC2 humidifier. 1 - Power supply isolator and MCB ( near the unit ) 2 - Power supply cable 3–...
  • Page 27 MC2 S LECTRO TEAM Installation - Step 6 F) U= 3 x 440-460-480 V ELMC 5 ELMC 5 to 70 to 90 Q2: 3 poles Q2: 3 poles Power In Power In 3 x 440V 208-230V 460-480V 50-60Hz 50-60Hz Q1: 2 poles 2A Q1: 2 poles GROUND GROUND...
  • Page 28 MC2 S LECTRO TEAM Installation - Step 6 TRANSFOMER (OPTION) The ELMC 5 to 90 humidifiers are electrically supplied in 3x400v + G + N. In case a neutral line is not available, this can however be easily substitued by the use of our optional transfomer preventing the installation of a specific neutral line.
  • Page 29 MC2 S LECTRO TEAM Installation - Step 6 Mark Intensity Fuse function Protection of the power contactor coil Protection of the inlet valve coil Protection of the drain valve coil 100mA Protection of the electronic boards ALL WORKS CONCERNED WITH ELECTRICAL INSTALLATION MUST BE CARRIED OUT BY A SKILLED AND QUALIFIED PERSONNEL Pictures for illustrating purposes only...
  • Page 30 MC2 S LECTRO TEAM Installation - Step 6 ALL WORKS CONCERNED WITH ELECTRICAL INSTALLATION MUST BE CARRIED OUT BY A SKILLED AND QUALIFIED PERSONNEL Pictures for illustrating purposes only...
  • Page 31 MC2 S LECTRO TEAM Installation - Step 6 ALL WORKS CONCERNED WITH ELECTRICAL INSTALLATION MUST BE CARRIED OUT BY A SKILLED AND QUALIFIED PERSONNEL Pictures for illustrating purposes only...
  • Page 32 MC2 S LECTRO TEAM Installation - Step 6 ALL WORKS CONCERNED WITH ELECTRICAL INSTALLATION MUST BE CARRIED OUT BY A SKILLED AND QUALIFIED PERSONNEL Pictures for illustrating purposes only...
  • Page 33 MC2 S LECTRO TEAM Installation - Step 6 ALL WORKS CONCERNED WITH ELECTRICAL INSTALLATION MUST BE CARRIED OUT BY A SKILLED AND QUALIFIED PERSONNEL Pictures for illustrating purposes only...
  • Page 34 MC2 S LECTRO TEAM Installation - Step 6 ALL WORKS CONCERNED WITH ELECTRICAL INSTALLATION MUST BE CARRIED OUT BY A SKILLED AND QUALIFIED PERSONNEL Pictures for illustrating purposes only...
  • Page 35 MC2 S LECTRO TEAM Installation - Step 6 ALL WORKS CONCERNED WITH ELECTRICAL INSTALLATION MUST BE CARRIED OUT BY A SKILLED AND QUALIFIED PERSONNEL Pictures for illustrating purposes only...
  • Page 36 MC2 S LECTRO TEAM Installation - Step 6 Steam bath control Dip Switch SW2: This makes possible the selection of the control signal - See under confi- guration). Connector X104: 15-16-17 Circuit board ref: 500102/28... Bridge between 1 & 2 Shunt entre 1 et 2 rouge White...
  • Page 37 MC2 S LECTRO TEAM Setting up Before putting your steam generator in operation, please make sure that your installation be in conformity with the manufacturer’s technical specifications. • Open the water valve of the main water line. • Switch on the main power supply contactors (voltage and command).
  • Page 38 MC2 S LECTRO TEAM System management - User information menu TTENTION • Any press on button 1 will allow you to shift menu • Use the up (2) and down (3) keys to scroll menu MENU : USER INFORMATION STEAM BATH ELMC ---- ----V STEAM PRODUCED ---- KG/H...
  • Page 39 MC2 S LECTRO TEAM System management - User information menu Continued PRODUCTION BEFORE 10000 KG This shows the number of kg of NEXT SERVIDE DUE ------ steam still available before next service. This a maintenance -- KG planning tool. This shows the number of hours still AVAILABLE TIME ----- available before service.
  • Page 40 MC2 S LECTRO TEAM Management system - Humidifier status menu TTENTION • Any press on button 1 will allow you to shift menu • Use the up (2) and down (3) keys to scroll menu HUMIDIFIER CON- FIGURATION CONTROL SIGNAL IN TEMP (°C) SENSOR Shows quantity...
  • Page 41 MC2 S LECTRO TEAM System management Configuration changing menu TTENTION • A press on button 1 will allow you to shift to sub-menu for changing configuration parameters. • Then scroll display using the up (2) or down (3) keys. • The selected parameter will flash and press return key (1) for recording. Changing configuration menu DIAL ACCESS CODE:...
  • Page 42 MC2 S LECTRO TEAM Management system Configuration changing menu Continued This allows to adjust how frequent the perfume PERFUME FREQUENCY ---- injections must be (from 1 to 99 mn). This allows to adjust how long the disinfection DISINFECTION injection time must be (from 1 to 99 mn). This DURATION ---- MIN requires the optional disinfection system.
  • Page 43 For hard or very hard waters, the use of a cleanable cylinder is recommended. A cleanable cylinder maintenance guide can be found on the next page. This should be seen as an help only and not be considered as a binding information from devatec in any case. Pictures for illustrating purposes only...
  • Page 44 MC2 S LECTRO TEAM Cylinder maintenance guide for tap or hard waters Estimated cylinder maintenance curve X= Humidifier steam demand 300 H 800 H 1000 H 2000 H 4000 H Working hours Example given: it is recommended to maintain (if cleanable type) or change (if disposable type) the steam cylinder every 800 to 900 hours of operation for a generator running at full capacity and using a water of TH20.
  • Page 45 MC2 S LECTRO TEAM Maintenance - Check points ROUTINE SERVICE • After the steam generator has run for about one hour time, check for any water leakage at the cylinder gasket and at the drain valve. • The cylinder should be inspected after about 50 hours of run. Make sure there is no arcing nor sparkling between the electrodes when the unit is in operation.
  • Page 46 MC2 S LECTRO TEAM Maintenance - Service & alerts Press Select button 1 to rotate between the menus and press the up or down buttons to enter the desired menu 50 HOURS AFTER SWITCHING ON - A « 1st inspection see after manuel » warning message is shown on the window.
  • Page 47 MC2 S LECTRO TEAM Maintenance - Service & alerts Press Select button 1 to rotate between the menus and press the up or down buttons to enter the desired menu CONTACTOR COIL « CONTACTOR COIL FAILURE P1» ALERT FAILURE P1 - When the alert «...
  • Page 48 MC2 S LECTRO TEAM Maintenance - Service & alerts NO INLET WATER « NO INLET WATER P4» ALERT - a « NO INLET WATER P4 » information is shown when the cylinder is not correctly filled. In this case, the steam generator is stopped. - Items to check : F2 inlet valve fuse, drain valve (could be clogged by pieces of calcius) - steam hose (pockets of water) - power voltage—TI voltage reading (condition of the torroidal of intensity—...
  • Page 49 For steam generators with multiple cylinders, wire up each corresponding Torroidal Trans- former with relevant method. TORROIDAL TRANSFORMER WIRING METHOD ElectroVap MC2 from 208V to 230V 10_2 15-2 Nb of phases Method n°1...
  • Page 50 MC2 S LECTRO TEAM Maintenance - Cleaning of steam cylinder The ELMC steam generators are currently fitted with disposable cylinder(s).The latter can however be easily substitued for cleanable type at customer’s choice. REPLACING THE STEAM CYLINDER Drain the steam cylinder(s) fully using the manual drain key. When the cylinder(s) is/are drained fully (a «...
  • Page 51 MC2 S LECTRO TEAM Maintenance - Valves DRAIN VALVE MAINTENANCE The drain valve should be maintained whenever the steam cylinder is maintained or changed. Once the steam cylinder has been pulled out (please refer to the « cleaning of the steam cylinder » page ), disconnect the drain valve supply wires.
  • Page 52 MC2 S LECTRO TEAM Maintenance - Valves INLET VALVE MAINTENANCE The inlet valve should be maintained every 6 months as a minimum and after 50 hours operation. Isolate the water supply and remove the water supply hose from the valve. Disconnect the electrical wires from the coil.
  • Page 53 MC2 S LECTRO TEAM Maintenance - Spares list Code Description 930058 Filling cup with hoses for ELMC 1 small sized cylinder 930059 Filling cup with hoses for ELMC 1 large sized cylinder 930060 Filling cup with hoses for ELMC 2 cylinders 930061 Filling cup with hoses for ELMC 3 cylinders (left hand side)
  • Page 54 MC2 S LECTRO TEAM Maintenance - Spares list Code Description 930190 Brass nut Ø8mm 930148 Bag of 3 fibre washers 15+18 930211 High water level electrode + nut Ø4mm Cylinder upper half—Please consult factory 930203 Bag of bolts & nuts ELMC small sized cylinder (cleanable cylinder ) 930223 Bag of bolts &...
  • Page 55 MC2 S LECTRO TEAM Maintenance - Spares list • In standard production, the steam generators are fitted with disposable cylinder(s) • EA= Softened water Code Description 930010 Small sized disposable cylinder 930020 Small sized isposable cylinder EA 930028 Small sized cleanable cylinder 930037 Small sized cleanable cylinder EA •...
  • Page 56 MC2 S LECTRO TEAM Maintenance - Spares list Code Description 930101 ELMC digital display (ref : 500600/03) 930104 Auxiliary board ELMC 40-50-60 (ref: 500301/05-2TI) 930105 Auxiliary board ELMC 90 (ref: 500301/05-3TI) 930091 Power contactor D18 930207 Power contactor D25 930093 Power contactor D32 930283 Power contactor DPE32P7...
  • Page 57 MC2 S LECTRO TEAM Notes Pictures for illustrating purposes only...
  • Page 58 MC2 S LECTRO TEAM Notes Pictures for illustrating purposes only...
  • Page 59 Pictures for illustrating purposes only...
  • Page 60 76550 Offranville - France LR 94104-2 Export Division: tel. +33 (0)2 35 83 06 44 ou +33 (0)2 35 83 03 86 Email: export@devatec.com - www.devatec.com devatec reserves the right to change specifications or design of the equipment described in this brochure without prior notice.

This manual is also suitable for:

Elmc 1 sm cylElmc 1 lg cylElmc 2 cylElmc 3 cyl

Table of Contents

Save PDF