Download Print this page

Aerial Airborne Wakeboard Tower Installation Manual page 8

Advertisement

STEP 6
STEP 2
SMALL
DAIMETER
Pilot Hole
Gelcoat
Fibreglass
8
Drilling
once you have marked your 4 holes, check the
underside of the deck for wires.
If necessary, you should move the wires out of
the way while you drill. we recommend drilling a small
pilot hole which will keep the 17/32" drill bit from walk-
ing (moving). A small rat tail file can be used to ease
the edge and keep the gel coat from chipping.
be careful of wires!
A
17/32" DRILL BIT
B
countersinK
(tHrougH gelcoat)
GUIDE#: pwb-AIrbornE-v1-004
C

Advertisement

loading