Download Print this page

Aerial Airborne Wakeboard Tower Installation Manual page 10

Advertisement

STEP 8 - CONTINUED...
steP 9
splIt lock wAshEr
m12 x 40mm
STEP 10
m12 x 40mm
splIt lock wAshEr
2.25" towEr joInt - thrEADED
10
the side rails need to be mounted straight up and
down. If they are leaning in or out, this will cause a
problem with the tower when you want to fold it.
splIt lock
wAshEr
m12 x 40mm
front lEG
2.25" towEr joInt - thrU holE
m6 x 12mm
splIt lock wAshEr
m12 x 40mm
splIt lock wAshEr
m6 x 12mm
lowEr sIDE rAIl
rEAr lEG
2.25" towEr joInt - thrU holE
m6 x 12mm
splIt lock wAshEr
m12 x 40mm
Assemble the hinge joints to
the end of the side sections.
m12 x 40mm
m6 x 12mm
2.25" towEr joInt - thrEADED
Assemble the hinge joint
fittings onto the side rails.
GUIDE#: pwb-AIrbornE-v1-004

Advertisement

loading