It is recommended that you follow the following checklist to ensure the reliability
and efficiency of the Delta lithium-ion battery pack.
1.
Check the State of Capacity every week via the UPS's LCD.
2.
Check the State of Health (SOH) every 3 months (i.e. perform deep
discharge test). If the SOH is lower than 30%, please replace the lithium-ion
battery module(s).
3.
Check the air flow every month.
Chapter 9 : Maintenance
25