Installing The Oil Cooler; Installing The Grass-Basket Hooks; Installing The Cutting Units - Toro Greensmaster TriFlex 3300 Operator's Manual

Traction unit
Hide thumbs Also See for Greensmaster TriFlex 3300:
Table of Contents

Advertisement

5

Installing the Oil Cooler

Optional
Parts needed for this procedure:
Oil Cooler Kit—Greensmaster 3300 Series Traction
Unit (Part No. 119-1691 [purchased separately])
Procedure
If you are operating the machine in hot climates,
where the ambient temperature is above 29°C (85°F),
or using it for heavy-duty use (mowing other than
greens, such as fairways or verticutting), install the
optional hydraulic oil cooler kit (Part No. 119-1691).
6
Installing the Grass-Basket
Hooks
Parts needed for this procedure:
6
Grass-basket hook
12
Flange bolts
Procedure
Install the 6 grass-basket hooks onto the ends of the
suspension-arm bars using the 12 flange bolts
9).
1. Flange bolt
2. Grass-basket hook
7

Installing the Cutting Units

Parts needed for this procedure:
1
Gauge bar
Cutting unit (obtain from your authorized Toro
3
Distributor)
3
Grass basket
Procedure
1.
Prepare the cutting units for installation; refer to
your cutting unit Operator's Manual.
2.
Apply grease to the inside diameter of the drive
coupler.
3.
Install the cutting units; refer to
(Figure
Cutting Units (page
13
Figure 9
3. Suspension-arm bar
Installing the
42).
g015492

Advertisement

Table of Contents
loading

This manual is also suitable for:

04510

Table of Contents