Safety Precautions; Warnings & Cautions - Watts Aerco Benchmark 5000 Reference Manual

With edge i controller
Hide thumbs Also See for Aerco Benchmark 5000:
Table of Contents

Advertisement

Benchmark with Edge [I] Controller: Reference Manual
SECTION 1: SAFETY PRECAUTIONS
SECTION 1: SAFETY PRECAUTIONS
1.1 WARNINGS & CAUTIONS
Installers and operating personnel MUST, at all times, observe all safety regulations. The
following warnings and cautions are general and must be given the same attention as specific
precautions included in these instructions. In addition to all the requirements included in this
AERCO Instruction Manual, the installation of units MUST conform with local building codes, or,
in the absence of local codes, ANSI Z223.1 (National Fuel Gas Code Publication No. NFPA-54)
for gas-fired boilers and ANSI/NFPASB for LP gas-fired boilers. Where applicable, the equipment
shall be installed in accordance with the current Installation Code for Gas Burning Appliances and
Equipment, CSA B149.1, and applicable Provincial regulations for the class; which should be
carefully followed in all cases. Authorities having jurisdiction should be consulted before
installations are made.
IMPORTANT!
This Instruction Manual is an integral part of the product and must be maintained in legible
condition. It must be given to the user by the installer and kept in a safe place for future reference.
WARNING!
Do not use matches, candles, flames, or other sources of ignition to check for gas leaks.
Fluids under pressure may cause injury to personnel or damage to equipment when released.
Be sure to shut off all incoming and outgoing water shutoff valves. Carefully decrease all
trapped pressures to zero before performing maintenance.
Before attempting to perform any maintenance on the unit, shut off all gas and electrical inputs
to the unit.
The exhaust vent pipe of the unit operates under a positive pressure and therefore must be
completely sealed to prevent leakage of combustion products into living spaces.
Electrical voltages up to 120 VAC (BMK750 – 2000), 208 or 480 VAC (BMK2500 –
BMK3000), 480 VAC (BMK4000 & 5000N), or 208, 480 or 575 VAC (BMK5000 & 6000) and
24 volts AC may be used in this equipment. On international units, the voltage can be 220V
to 240V single phase. Therefore the cover on the unit's power panel (located behind the unit's
front panel) must be installed at all times, except during maintenance and servicing.
A single-pole switch for single phase units, or three-pole switch for three phase units, must be
installed on the electrical supply line external to the unit. The switch must be installed in an
easily accessible position to quickly and safely disconnect electrical service. Do not affix
switch to unit sheet metal enclosures.
CAUTION!
Many soaps used for gas pipe leak testing are corrosive to metals. The piping must be rinsed
thoroughly with clean water after leak checks have been completed.
DO NOT use this boiler if any part has been under water. Call a qualified service technician
to inspect and replace any part that has been under water.
OMM-0146_A • GF-219 • 5/25/2020
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
Page 3 of 76

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents