FIP FLS M9.50 Series Manual page 5

Batch controller
Table of Contents

Advertisement

Panel installation
Fix instrument on the panel rotating by hand the fixing snails (M9.SN1).
Wall installation
Use the panel mounting kit (M9.SN1) to fix the M9.50 on the dedicated frontal
cutout of the wall mounting kit (M9.KWX).
Tighten front screws of box and waterproof connectors of cables, internally
mount caps on screw sites to get a IP65 watertight installation.
WIRING
General recommendation
Always ensure the power supply is switched off before working on the device.
Make wiring connections according to wiring diagrams.
• Terminals accept 26 to 12 AWG (0.08 to 2.5 mm2)
• Strip around 10 mm (0.4") of insulation from the wire tips and tin bare ends to
avoid fraying.
• Ferrules are suggested when connecting more than one wire to a single
terminal.
5