Read below instruction carefully.
See more information in the instruction manual.
TOOLS
Screwdriver
M14 sleeve tool
M10 wrench
M17 wrench
Measure
Step 1.
Remove the bolt from rail.
Remove cover
Step 3.
Remove the belt(12) from
coil, the flywheel can only spin
as arrow direction see picture.
Step 5.
Assemble new flywheel (15)
Replacement of flywheel
Models: Echelon Row
Loosen nuts (8) and (13) from coil.
Remove the nuts (8) and Powder metallurgy(14)
Belt should be under pully , and tighten the nuts (8)
and Powder metallurgy(14) on main frame.
Step 2
Step 4.
from flywheel.
Step 6.
Need help?
Do you have a question about the Row and is the answer not in the manual?
Questions and answers