Installing the sauna oven

Affix the feet on the rear wall of the oven using
the screws supplied (4 screws M5 x 12).
Fasten the bottom panel to the inner sheath with
4 self-tapping screws 3.9 x 9.5.
Thread the mains cable into the terminal box
through the hole provided for it.
After making the electrical connection of the
mains cable, close the cover on the terminal box
again (with the spacer on the outside).
Position the sauna oven in front of the air intake
opening. Secure the wall bracket to the wall of
the booth using the wood screws supplied.
2 x Wall bracket
4 x Securing
screws
(wood
screws)
5 x 35
Screws
4 x M5 x 12
Bottom panel
11.12.2007
Insert the stone grate (see description entitled
„Placing the sauna stones on the stone grate",
section entitled „Cleaning and care", page 20).
Self-tapping screws
3.9 x 9.5
Terminal box
10:33 Uhr
Seite 17
GB
Screws
4 x M5 x 12
Sauna heater
foot
17