4. Replace the pump.
5. Connect the drainage duct
and screw the new pump.
6. Install and screw the water
tray.
◆ Wall Mounted Type IDU
Step
1.Remove the louver
2.Open the front panel
3. Remove the electrical box
cover 2
1. Screw the outlet pipe
2. Screw the pump
Removal of Fan Motor
Remark: before removing, making sure power is disconnected.
Diagram
DC Inverter Side Discharge VRF Ⅱ
●Replace the pump.
●Connect the drainage duct and use a
screwdriver to screw the new pump.
Tighten the screws
●Use a screwdriver to screw the water tray.
Operation Procedure
●Take off the axle bush of the louver.
●Remove the louver.
●Hold the indents on both sides of the
panel and pull it out in the direction
shown by the arrow.
box cover with a screwdriver. Take off
the box cover 2.
●Detach the ambient temperature sensor
from the conduit.
for North America
85
Need help?
Do you have a question about the ULTRA heating GMV5 Multi VRF Series and is the answer not in the manual?
Questions and answers