Additional Information; Maintenance; Care Instructions; Disposal Instructions - Image Engineering iQ-LED V2 Setup Instructions

Iq-led bundle v2
Table of Contents

Advertisement

3 ADDITIONAL INFORMATION

3.1 Maintenance

The spectrometer requires a recalibration once a year, regardless of the operating hours. If a spectrometer
calibration is necessary, please contact Image Engineering.

3.2 Care instructions

Do not touch, scratch or pollute the LED's
Do not remove the fiber from the spectrometer, or else the calibration is invalid, and the
spectrometer has to be recalibrated!

3.3 Disposal Instructions

After the service life of the iQ-LED bundle, it must be disposed of properly. Electrical and electromechanical
components are included. Observe your national regulations and make sure that third parties can not use the iQ-
LED after disposal.
Contact Image Engineering if assistance for disposal is required.
Image Engineering
Error! Use the Home tab to apply Titel to the text that you want to appear here.
Error! Use the Home tab to apply Überschrift 1 to the text that you want to appear here.
Seite 8 von 11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the iQ-LED V2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents