Zenoah PSJ2300 Owner's Manual page 14

Zenoah pole saw owner's manual
Table of Contents

Advertisement

SE6
(1)
(2)
(3)
(4)
(5)
SE7
SE8
14
English
5. Set up
■ ATTACHING THE PRUNING
MECHANISM (SE6)
1. Remove the cap on the end of the
main pipe.
2. Remove the screw screwed into
the end of the gear case.
3. Insert the end of the gear case into
the main pipe.
4. Line up the hole on the end of the
gear case into which the screw is
to be inserted with the hole on the
main pipe, and screw the screw
firmly in.
5. Using a wrench, screw in the bolt
provided to fix the mechanism into
place.
(1) Main pipe
(2) Gear case
(3) Screw hole
(4)Fastening bolt
(5) Bolt
A standard package contains the
items as shown below. (SE7)
(1) Guide bar
(2) Saw chain
(3) Gear case
(4) Sprocket
(5) Chain tension adjust screw
Nut
(7) Chain tensioner nut
cover
Install the guide bar and the saw
chain on the gear case as follows.
WARNING
The saw chain has very sharp
edges. Use protective gloves for
safety.
1. Loosen a nut and remove the
chain cover.
2. Mount the guide bar then fit the
saw chain around the bar and
sprocket.(SE8)
WARNING
Pay attention to the correct
direction of the saw chain
中 文
5 安装
■安装修枝机构(SE6)
1. 拆下主管末端的盖子。
2. 拆下拧在齿轮箱末端的螺钉。
3. 将齿轮箱的末端插入主管中。
4. 将齿轮箱上的螺丝孔与主管上的螺
丝孔对齐,插入螺钉然后拧紧。
5. 使用扳手拧紧随附的螺栓以将修枝
机构固定到位。
(1)主管
(2)齿轮箱
(3)螺丝孔
(4)紧固螺栓
(5)螺栓
标准零件包中包含以下所示零件。
(SE7)
(1)导板
(2)锯链
(6)
(3)齿轮箱
(4)链齿
(8) Chain
(5)链条张力调节螺钉
(6)螺母
(7)链条张紧螺母
(8)链条盖
如下所示将导板和锯链安装到齿轮箱。
警 告
锯链的边缘非常锋利。请佩戴防护手套
以策安全。
1. 拧松螺母并拆下链条盖。
2. 安装导板,然后将绕着导板和链齿
安装锯链。(SE8)
警 告
请注意锯链的正确方向

Advertisement

Table of Contents
loading

Table of Contents