Mist Kit for EBZ8000 / EBZ8001
4. Set up
COMPONENTS
(A) Tank Ass'y ............. 1
(B) Valve Ass'y ............ 1
(C) Mist Nozzle Ass'y .. 1
(D) Frame .................... 1
(E) Plate ...................... 1
(F) Plate ...................... 2
(G) Plate ...................... 2
(H) Spacer .................. 1
(I) Pipe ....................... 1
(J) Screw 5 x 14 ......... 4
(K) Screw 5 x 20 ......... 2
(L) Screw 5 x 25 ......... 6
(M) Tube ...................... 1
(N) Clip ....................... 4
(O) Clamp ................... 1
ASSEMBLY
1. Remove the back pad from the back plate.
2. Fit frame (D) in the groove of the back plate, and fas-
ten it with 2 plates (G) and 6 screws (L).
3. Fasten the spacer (H) with 2 screws (K) .
4. Replace the back pad.
(L)
(G)
(L)
GB-6
(pcs.)
(D)
(2)
(1) Back plate
(2) Back pad
(1)
(D)
(L)
(G)
(H)
(L)
(K)
(B)
(A)
(E)
(G)
(F)
(J)
(K)
5. Set the tank (A) as shown in the picture, and fasten it
with the plate (E), 2 plates (F) and 4 screws (J) .
6. Connect the tube (M) to the volute and tank (A) , and
fasten it with 2 clips (N) .
(A)
(N)
(M)
(N)
7. Connect the mist nozzle ass'y (C) with the pipe (I) .
8. Connect the valve ass'y (B) to the tank (A) and mist
nozzle ass'y (C) , and fix them with 2 clips (N) .
TIGHTENING TORQUE
(M)
(C)
(N)
(H)
(O)
(L)
( I )
(F)
(J)
(F)
(E)
(J)
(1)
(1) Volute
(N)
(B)
(N)
( I )
(C)
±
3.5
0.5 N·m