Installation and start-up
The following two variants are possible for operating the CO alarm:
Wall installation
Take the following steps in the specified order to install the alarm on the wall:
1. Use a water level to mark the
drill holes in the horizontal
position. (Spacing 60 mm)
2. Drill the holes with a suitable
power drill at the previously
marked locations. (Ø 5 mm)
Make sure not to damage any cables!
Installation and start-up
60 mm
Ø 5 mm
25