Heating Operation (For Gas Units) - Standard Economizer; Ignition Module Low, Medium And High Heat; Two-Speed Indoor Fan Control; Cooling Operation - Trane Foundation GBC Series Installation, Operation And Maintenance Manual

Packaged rooftop air conditioners foundation cooling and gas/electric 7.5 to 12.5 tons, 60 hz
Table of Contents

Advertisement

S S t t a a r r t t U U p p
setpoint, the thermostat closesW1 contacts the first
stage electric heat contactor (AH or AH and CH) is
energized. If the first stage of electric heat cannot
satisfy the heating requirement, the thermostat closes
W2.
When the W2 contacts close, the second stage electric
heat contactor (BH or BH and DH) is energized, if
applicable. The thermostat cycles both the first and
second stages of heat "On" and "Off" as required to
maintain the zone temperature setpoint.
Heating Operation (for Gas Units) -
Standard Economizer
When the system switch is set to the "Heat" position
and the zone temperature falls below the heating
setpoint, the Ignition module (IGN) initiates a heat
cycle.
Ignition Module Low, Medium and High
Heat
Two-stage (IGN) runs self-check (including verification
that the gas valve is de-energized). (IGN) checks the
high-limit switches (TC01 and TC01) for normally
closed contacts, the pressure switch (PS) for normally
open contacts, and the flame rollout (FR) switch for
continuity. (IGN) energizes inducer blower on high
speed to check pressure switch closure. If the pressure
switch is closed, the inducer blower starts a 20 second
pre-purge (15 seconds on high speed followed by 5
seconds on low speed).
If the pressure switch (PS) is still open, the inducer
blower will continue to be energized on high speed
until pressure switch closure.
After pre-purge completes, the (IGN) energizes the first
stage of the gas valve, initiates spark for 2 seconds
minimum, 7 seconds maximum (ignition trial) and
detects flame and de-energizes spark. From this point,
a fixed 45 second indoor blower delay on timing starts.
After the indoor blower delay on is completed, the
(IGN) energizes the indoor blower. The (IGN) enters a
normal operating loop where all inputs are
continuously monitored. If the first stage of gas heat
cannot satisfy the heating requirement, the thermostat
closes W2. The (IGN) energizes the second stage of the
gas valve and the second stage of inducer blower.
When the zone thermostat is satisfied, the (IGN) de-
energizes the gas valve. The (IGN) senses loss of flame.
The (IGN) initiates a 5 second inducer blower post
purge and 90 second indoor blower delay off at current
speed. The (IGN) de-energizes the inducer blower at
the end of the post purge. The (IGN) de-energizes the
indoor blower at the end of the selected indoor blower
delay off.
26
Table 8. Ignition module diagnostics
Module is powered up, but no active call
Steady light
for heat.
Blinking at
continuous steady
Active call for heat.
rate
One blink
Loss of communication.
System lockout (failure to ignite, no
Two blinks
spark, low/ no gas pressure, etc.)
Pressure switch (no vent air flow, bad
Three blinks
CBM, closed at initial call for heat). Auto
reset.
High limit (excessive heat in combustion
Four blinks
chamber, low airflow). Auto reset.
Flame sensed and gas valve not
Five blinks
energized or flame sensed and no call
for heat.
Flame rollout (CBM failure, incorrect gas
pressure, and incorrect primary air).
Six blinks
Requires manual reset of the switch.
W1 and W2 swapped (electromechanical
Seven blinks
3-10 tons units).

Two-Speed Indoor Fan Control

For units equipped with two-speed indoor fan control,
standard unit operation for cooling and heating will
continue and all unit functions will operate normally,
except for the control of the indoor fan speed. All units
configured with any type of heating will heat the supply
air and space as normal utilizing full speed indoor fan
by energizing the appropriate outputs. The two-speed
indoor fan unit will only utilize two speeds during the
cooling operation modes described below.

Cooling Operation

For cooling operation, the unit will operate at Low Fan
Speed during Fan Only, Economizer Only, and the first
stage of compressor unit modes by Default. When the
unit receives a call for cooling, if the economizer is
enabled, the unit will energize the associated Low
Speed output and begin to modulate the OA Damper
open above minimum position up to 100% as
necessary. By default, the supply fan will remain at low
speed for the duration of Economizer-Only cooling. If
the supply fan is on when the first stage compressor is
energized, it will remain energized or energize at low
speed for the duration of Cool 1.
When there is a call for Cool 2, the second compressor
is energized and the Supply Fan will switch to High
Speed.
The unit will stage down compressors for cooling in
reverse order that they were staged and the supply fan
will follow the unit mode transitions. Once it is
determined through normal cooling control that the
second compressor is no longer necessary to meet
RT-SVX069A-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents