Download Print this page

Vestil WP Series Instruction Manual page 14

Work platforms
Hide thumbs Also See for WP Series:

Advertisement

Table of Contents
EMERGENCY STOP SWITCH INSTALLATION
The following instructions apply ONLY to LP or gasoline powered fork trucks. If the truck designated for use with
work platforms is powered either by battery or diesel fuel, contact the truck manufacturer for installation directions.
Item
Description
1
¼ in. - 20 x 1in.
2
¼ in. - 20 lock nut
3
¼ in. flat washer
4
¼ in. fender washer
5
Fork truck junction box (FTJB)
Jumper cord
6
Work platform junction box
(WPJB)
Mounting
plate with
bolt holes
INSTALLING THE SWITCH
1)
Attach the fork truck junction box (5) to the fork
lift. For instance, attach it to the operator roll cage
as shown in FIGS. 8 & 9. Fasten the junction box
(5) to the lift truck with 4 bolts, 4 flat washers, and 4
lock nuts.
2) Disconnect the wire from the ignition coil (key
switch) of the lift truck. Attach the wire to 1 of the
receptacle terminals inside the fork truck junction box
(5).
3) Connect the appropriate wire from the (ignition)
key switch to the other receptacle terminal inside the
junction box (5).
4) Mount the work platform junction box (6) to the
mast guard. Position the junction box as shown in
Fig. 10. Fasten the WPJB to the inside surface of the
mast guard. Fastener order is shown in Fig. 11.
USING THE SWITCH
To use the switch, mount the platform on the forks of your lift truck. Apply all tine locks and safety straps. Attach the
(male) plug of the pigtail cord to the socket of the FTJB. Pull the E-stop button out/up. The switch is now ready to use.
Press the button to immediately cut forklift power.
If your platform is equipped with an E-switch but you need to operate the forklift without the platform: 1) Disconnect
the pigtail cord from the FTJB socket; and 2) Plug the FTJB jumper cord into the socket Connecting the jumper cord to
the socket closes the ignition circuit.
Table of Contents
Rev. 4/3/2020
FIG. 8: FTJB and
Quantity
8
WPJB mounting
8
diagram
8
4
1
Mounting
plate with
bolt holes
1
E-stop
button
Coil
cord
Pigtail
cord
FIG. 10: Mounting WPJB
Copyright 2020 Vestil Manufacturing Co.
Coil
cord
6
Mast guard
Jumper plug
#6 Work
platform junction
box (WPJB)
Jumper
cord
Connect
Ignition coil terminal & key switch
to key
of lift truck. Disconnect from
switch
battery and connect to FTJB
Mount
WPJB
here
5
FIG. 9: E-Switch
E-stop button
electrical system
diagram
#5 Fork truck junction box (FTJB)
Connect to positive side of
ignition coil
FIG. 11: Fastener order
WPJB
mounting plate
1
Mast
Guard
Inner surface (of
mast guard)
Page 14 of 17
WP, MANUAL
Fork
truck
battery
4
3
2
Outside
surface

Advertisement

loading