Gas Firing Unit - Yukon Eagle Oil Furnace Owner's Manual

Eagle i - husky & eagle ii - polar oil/wood - gas/wood warm air central heating furnaces
Table of Contents

Advertisement

Gas Firing the Unit
To Start the Gas burner on new installation
1. With gas line in "off" position, install burner using gasket
and tighten down with 3 nuts to furnace.
2. Connect 110 Volt power to burner
3. Connect 24 Volt power to the burner from the DS-103 Ver-
satrol.
4. Set room thermostat 10 degrees above room temperature.
5. Allow burner to operate for 2 minutes until all air is purged
from gas line.
6. Adjust burner air to allow red flame to enter wood combus-
tion chamber about 6 inches.
7. Set the draft regulator on the chimney to .03" Water Col-
umn negative to the chimney with burner operating at least
5 minutes.
8. Gas burner air should be adjusted with CO-2 meter to in-
sure maximum burner efficiency.
9. Refer to burner manual for service tips.
Operating Instructions
32
WAYNE MODEL P250
GAS BURNER
FIG. 30

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lwo-112Lwg-112Lwo-168Lwg-168

Table of Contents