VOGT ICE TUBE-ICE P-24A Service Manual page 143

Table of Contents

Advertisement

P24A & P34A Service Manual
A
A Brief History Of Vogt Tube Ice, L.L.C.-----------------1-1
Adding Refrigerant---------------------------------------------5-6
Ammonia Specification by Grade--------------------------5-2
Ammonia (amount required) --------------------------------5-2
Ammonia Removal ------------------------------------------ 9-17
Assembly Drawing P24A------------------------ 1-4, 1-5, 1-6
Assembly Drawing P34A-------------- 1-8, 1-9, 1-10, 1-11
Automatic blowdown (Harvest Cycle) --------------------9-1
Auxiliary Controls or Equipment ------------------------- 3-19
B
Basic Product Warranty ------------------ inside back cover
Bearing Bracket and Cutter Disc Removal------------ 9-10
Belt Tension --------------------------------------------------- 9-24
Belt Replacement -------------------------------------------- 9-24
Bin Level Control -----------------------------------------------6-1
Blowdown -------------------------------------------------------9-1
C
Capacity Ratings (P24A)----------------------------------- 11-4
Charging From Tank Truck----------------------------------5-3
Charging From Cylinders ------------------------------------5-3
Charging Refrigeration System (Precautions) ---1-3, 5-2
Charging Valve-Freezer (28)------------------------------------
P24A ------------------------------------------------------1-4
P34A ------------------------------------------------------1-8
Check Valve (101) ------------------------------------------- 1-11
Circulating Water Pump Motor --------------------------- 9-21
Cleaning Procedure (Ice Making Section)---------------7-3
Cleaning Ice Making Section -------------------------------9-1
Compressor -----------------------------------------------------7-6
Compressor Cooling Solenoid Valve(64) ----- 1-12, 9-23
Compressor Cooling Water In And Out --------------- 3-10
Compressor Cooling Water Inlet Valve (45) ---------- 1-12
Compressor Crankcase Heater ----------------------------9-4
Compressor Diagram ( P24A ) --------------------------- 1-12
Compressor Discharge Purge Valve (78) ------------- 1-12
Compressor Discharge Valve (35) ------------------1-6, 1-9
Compressor Inspection------------------------------------- 9-23
Compressor Maintenance -----------------------------------7-7
Compressor Loosing Oil Excessively------------------- 8-10
Compressor Oil Changing --------------------------------- 9-23
Compressor Oil Pressure Low --------------------------- 8-10
Compressor Running Unloaded During Freeze -------8-9
Compressor Servicing -------------------------------------- 9-26
Compressor Suction Valve (34)-------------------- 1-5, 1-11
Compressor Suction Purge Valve (77)----------------- 1-12
Compressor Water Regulating Valve (54) ------------ 1-12
Condenser Ammonia Drain Valve (44)----------- 1-6, 1-11
Condenser Ammonia Charging Valve (44)--------------1-6
Condenser Cleaning ------------------------------------------9-6
Condenser Purge Valve (59)------------------------ 1-6, 1-10
12/26/12
12. Index
Condenser Safety Valves (50) ----------------------------------
P24A ----------------------------------------------------- 1-6
P34A ----------------------------------------------------1-10
Condenser Taw Gas Outlet Stop Valve (89)----------- 1-8
Condenser Water In And Out -----------------------------3-11
Condenser Water Requirements-------------------------3-12
Condenser Water Usage (P24A and P34A) ----------11-5
Control Circuit Protection------------------------------------ 9-4
Control Panel --------------------------------------- 5-5, 6-2, 6-3
Control Panel Parts ----------------------------------- 6-2 , 6-3
Cooling Tower -------------------------------------------------3-11
Cooling Tower/ Evap Condenser-------------------------- 7-5
Cooling Tower Maintenance Schedule ------------------ 7-6
Cooling Tower Piping Diagram ------------------ 3-14, 3-15
Crushed Ice Production-------------------------------------10-2
Current Unbalance -------------------------------------------3-16
Cutter Adapter Plate Installation -------------------------9-16
adjustment---------------------------------------------9-16
Cutter Assembly (P24A)----------------------------------- 9-13
parts list ------------------------------------------------9-14
Cutter Assembly Removal and Installation------------9-10
Cutter Blade Replacement---------------------------------9-15
adjustment---------------------------------------------9-16
Cutter Disc Removal ----------------------------------------9-10
Cutter Gear Reducer ----------------------------------- 7-7, 9-6
drive gear replacement------------------------------ 9-7
gear reducer replacement -------------------------- 9-8
Cutter Height Adjustment ----------------------------------9-12
Cutter Ring Gear Replacement---------------------------9-15
Cutter Parts Weights ----------------------------------------- 9-9
Cutter Shaft & Bearing Removal/Installation----------9-11
D
Description Of Machine-------------------------------------- 2-1
Discharge Stop Valve (55) ---------------------------------- 1-5
Discharge Line Stop Valve (55) --------------------------- 1-9
Draining Oil Trap---------------------------------------------9-19
Drive Gear Replacement ------------------------------------ 9-7
E
Electrical Schematic, All Voltages 50-60 Hz. ---------- 6-4
Electrical Controls--------------------------------------------- 6-1
Equalizing Line Stop Valve (92) --------------------------1-10
F
Fan Control ( cooling tower ) ------------------------------- 9-3
Fan Control Switch-------------------------------------------- 9-3
Float Switch----------------------------------------------------- 9-1
Float Switch Stop Valve (10A) ----------------------------- 1-9
Float Valve (Make-Up Water) ------------------------------ 9-1
Flushing Water In --------------------------------------------3-10
12-1
INDEX

Advertisement

Table of Contents
loading

Related Products for VOGT ICE TUBE-ICE P-24A

This manual is also suitable for:

Tube-ice p-34a

Table of Contents