Evaporators, Compact Water Boxes (Ft.-In.) - York YR Owner's Manual

Twin-screw compressor liquid chillers design level a 200 through 430 tons (60 hz) 700 through 1500 kw (50 hz) 170 through 365 tons (50 hz) 600 through 1280 kw (50 hz)
Hide thumbs Also See for YR:
Table of Contents

Advertisement

Dimensions (Ft.-In.) – Nozzle Arrangements
EVAPORATORS – COMPACT WATER BOXES
REAR
OF UNIT
A
CC
EVAPORATOR
GG
1"
MOTOR END
REAR
OF UNIT
B
C
DD
BB
EVAPORATOR
GG
1"
MOTOR END
REAR
OF UNIT
F
G
DD
BB
EVAPORATOR
GG
1"
MOTOR END
EVAPORATOR
NOZZLE PIPE SIZE
SHELL
NO. OF PASSES
CODE
1
2
T, V
8"
6"
W, X
10"
8"
NOTES:
1. Standard water nozzles are furnished as welding stub-outs with Victaulic grooves, allowing the option of welding, flanges, or use of
Victaulic couplings. Factory installed, class 150 (ANSI B16.5, round slip-on, forged carbon steel with 1/16" raised face), water flanged
nozzles are optional (add 1/2" to nozzle length). Companion flanges, nuts, bolts, and gaskets are not furnished.
2. Add 1" for isolators as shown.
3. One-, two- and three-pass nozzle arrangements are available only in pairs shown and for all shell codes. Any pair of evaporator nozzles
may be used in combination with any pair of condenser nozzles.
4. Connected piping should allow for removal of compact water boxes for tube access and cleaning.
5. Rear of unit is defined as side of chiller opposite control center.
28
H
EVAPORATOR
GG
FLOOR LINE
COMPRESSOR END
J
K
EVAPORATOR
GG
FLOOR LINE
COMPRESSOR END
N
P
EVAPORATOR
GG
FLOOR LINE
COMPRESSOR END
1-PASS
2
3
CC
G G
4"
1'–10-3/4"
1'–3-1/2"
6"
2'–0-3/4"
1'–5-1/2"
REAR
OF UNIT
ARRANGEMENTS
NO. OF
CC
PASSES
1
1"
REAR
OF UNIT
ARRANGEMENTS
NO. OF
PASSES
DD
2
BB
NOTE: Water must enter
through bottom connection to
achieve rated performance.
1"
REAR
OF UNIT
ARRANGEMENTS
NO. OF
PASSES
DD
BB
3
NOTE: Water must enter
through bottom connection to
1"
achieve rated performance.
EVAPORATOR
NOZZLE DIMENSIONS
2-PASS
2
2
BB
DD
1'–3"
2'–6-1/2"
1'–4-3/4"
2'–8-3/4"
FORM 160.81-EG1
1-PASS
NOZZLE
EVAP.
IN
OUT
A
H
H
A
2-PASS
NOZZLE
EVAP.
IN
OUT
C
B
K
J
3-PASS
NOZZLE
EVAP.
IN
OUT
G
N
P
F
3-PASS
2
G G
BB
D D
1'–3-1/2"
1'–3"
2'–6-1/2" 1'–3-1/2"
1'–5-1/2" 1'–4-3/4" 2'–8-3/4" 1'–5-1/2"
YORK INTERNATIONAL
LD07615
G G

Advertisement

Table of Contents
loading

This manual is also suitable for:

Maxe yr

Table of Contents