D.system Set-Up And Operation; Initialization And Self-Examination - JTS CS-120 Series Manual

Digital conference system
Table of Contents

Advertisement

D.System Set-up and Operation

After finishing the installation and connection of conference system,
the user should plan thoroughly with operation directory and buttons
before the conference. The operation items will show as the following
figures on LCD.

4-1 Initialization and Self-examination

After CU has electric power, the system will start initialization and
self-examination as the following figures show:
Connect with PC
When CU connects with PC, the front panel will be locked, and all operation
directory cannot be accessed, as the right figure shows:
When the application software is operating in computer control mode, the
front panel of CU will be locked, and the user cannot control and set the
system. Therefore, before controlling and setting CU, please shut down
the application software or disconnect CU with PC.
16
CS-120 Conference System Product Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs-120chCs-120duCs-120cu

Table of Contents