FSI DAT Series Instruction Manual page 26

Shelters/showers
Table of Contents

Advertisement

TEAR DOWN AND STORAGE OF UNIT
Step 1: Loosen all Velcro/
other closure doors
completely so frame can be
collapsed for storage
Step 2: Deflate and remove
the decon pool.
Step 3: Remove the floor.
Step 4: Carefully bring the
framed unit down to the
ground.
Step 5: Use the supplied belt
tie (s) to tighten the frame to
it's smallest size.
Step 6: Place the frame unit,
repair kit, floor, and pool into
supplied carry bag/sleeve.
Step 7: Use the other
supplied belt tie (s) to tighten
the carry bag further—again
with a goal of attaining a
smaller 'footprint' for storage.
Step 8: Store the unit in as
close to room temperature as
is possible and feasible.
26

Advertisement

Table of Contents
loading

Table of Contents