Download Print this page
FSI DAT QE Series Setup Instructions

FSI DAT QE Series Setup Instructions

Hide thumbs Also See for DAT QE Series:

Advertisement

Quick Links

 
 
DAT® QE Series Shelter 
 
Setup Instructions 
 

Advertisement

loading

Summary of Contents for FSI DAT QE Series

  • Page 1     DAT® QE Series Shelter    Setup Instructions   ...
  • Page 2 1) QE Series Shelter packed in carry bag/sleeve.         2) Undo D‐Ring buckles on bag/sleeve, open, then remove straps from around shelter.     ...
  • Page 3 3) Lay out floor where the QE will be set up.  Place floor with the black straps facing the ground.          4) Place Shelter in center of floor.     ...
  • Page 4 5) With personnel at each corner ( with limited personnel, one at each diagonal corner ) pull apart  to spread out the frame.        6) Place one end of shelter at the edge of the floor.     ...
  • Page 5 7) Tie straps from floor to frame of shelter at one end.          8) Lift center of shelter and attach push poles to supplied points.     ...
  • Page 6 9) Using two personnel with push poles and one person at end of shelter that is not attached to  floor, push up with the push poles while pushing in on the unattached side of shelter.             ...
  • Page 7 10) Tie remaining side of floor to shelter frame and attach ends if supplied.               ...

This manual is also suitable for:

Dat qe3060Dat qe1327