DAT® 'QE SERIES'® 'QUICK ERECT' SHOWER
SET UP PROCEDURES FOR USE
Step 1: Spread groundsheet
Step 2: Place shower bag/sleeve in the middle of groundsheet.
Step 3: Remove shower bag/sleeve. You should arrive at the
picture on the left. It is important to spread the groundsheet first to
protect the shower from possible damage.
Step 4: With 2/4 persons (size and shower dependent), stand at
each corner of the shower.
Step 5: Spread/pull the shower frame apart. Take note not to step
on the canopy fabric. Also take note that the spreading/pulling
should be done uniformly, with equal speed.
Step 6: Erect the frame by raising the center and pulling the
frame sides in uniformly. When the frames are fully deployed,
adjust canopy fabric as needed.
Step 7: Place the floor first inside the unit and use the Velcro to
attach the floor to the inner canopy.
Step 8: Secure the plumbing as instructed on the next page.
Step 9: Place the decon pool inside the unit, position, attach, and
inflate for use as pictured on the next page.
24
SET UP TIPS
1. An important tip
for deploying the
struts correctly is
for the 2-4 person
set up crew (size
of unit dependent)
to push the shelter
upwards together
from opposite
sides. If one side
pushes and the
other does not,
there can be
applied stress on
one side of the
articulating frame.