IBM Power System E950 User Manual page 94

Memory modules for the 9040-mr9
Hide thumbs Also See for Power System E950:
Table of Contents

Advertisement

Figure 59. Connecting the power cords
5. Using your labels, reconnect all of the external cables that plug into the PCIe adapters.
6. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/
POWER9/p9haj/crustartsys.htm).
7. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/
knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm).
8. Verify the installed part.
• If you replaced the part because of a service action, verify the installed part. For instructions, see
Verifying a repair (www.ibm.com/support/knowledgecenter/POWER9/p9ect/
pxect_verifyrepair.htm).
• If you installed the part for any other reason, verify the installed part. For instructions, see Verifying
the installed part (www.ibm.com/support/knowledgecenter/POWER9/p9haj/pxhaj_hsmverify.htm).
80 Power Systems: Power Systems: Memory

Advertisement

Table of Contents
loading

This manual is also suitable for:

9040-mr9

Table of Contents