Amana CVC96 BB Series Installation Instructions Manual page 12

Two-stage gas furnace
Hide thumbs Also See for CVC96 BB Series:
Table of Contents

Advertisement

VENTING MATERIAL REQUIREMENTS
PVC
SCHEDULE 40 PIPE
SCHEDULE 40 CELLULAR CORE PIPE
SDR 21 OR 26 PIPE
FITTINGS
ABS
SCHEDULE 40 PIPE
SCHEDULE 40 CELLULAR CORE PIPE
FITTINGS
CPVC
SCHEDULE 40 PIPE
SDR 21 OR 26 PIPE
FITTINGS
POLYPROPYLENE
INNOFLUE® (CENTROTHERM)
POLYPRO® (DURAVENT)
PRIMER & SOLVENT CEMENT
PVC PRIMER
CPVC PRIMER
PVC SOLVENT CEMENT
CPVC SOLVENT CEMENT
ABS SOLVENT CEMENT
ABS / PVC / CPVC ALL PURPOSE CEMENT (FOR PIPE & 
FITTINGS OF THE SAME MATERIAL)
TRANSITION CEMENT FOR ABS TO PVC or CPVC
INSTALLATIONS IN CANADA
PVC & CPVC PIPE & FITTINGS
PVC & CPVC SOLVENT CEMENT
TRANSITION CEMENT
INNOFLUE® (CENTROTHERM)
POLYPRO® (DURAVENT)
Upon completion of the furnace installation,
carefully inspect the entire flue system both
inside and outside of the furnace to assure it is
properly sealed. Leaks in the flue system can
result in serious personal injury or death due
to exposure to flue products, including carbon
monoxide.
Failure to follow these instructions can result
in bodily injury or death. Carefully read and
follow all instructions given in this section.
ASTM STANDARD
D1785
F891
D2241
D2466
D1527
F628
D2468
F441
F442
F438
F656
F656
D2564
F493
D2235
D2564, D2235, F493
D3188
ULC S636
WARNING
WARNING
To avoid bodily injury, fire or explosion, solvent
cements must be kept away from all ignition
sources (i.e., sparks, open flames, and excessive
heat) as they are combustible liquids. Avoid
breathing cement vapors or contact with skin
and/or eyes.
ACCEPTABLE
12
WARNING
PREFERRED
Figure 4
TRANSITION NO LESS
THAN 45 DEGREES TO
HORIZONTAL PLANE TO
AVOID CREATING A WATER
TRAP IN VENT PIPING.
Figure 5
NO TRANSITION ON
HORIZONTAL PLANE,
THIS CREATES A
WATER TRAP AND
RESTRICTS FLUE
GASES
Figure 6

Advertisement

Table of Contents
loading

Table of Contents