Huawei OceanStor Dorado5100 Quick Installation Manual page 13

Table of Contents

Advertisement

Power On Devices
 Before powering on the device, ensure that the disk enclosures are properly connected to the
controller enclosure.
 The power-on process takes about three to five minutes. The startup of the controller enclosure is
followed by the startup of the disk enclosures.
 Check the status indicators on the controller enclosure and disk enclosures after the devices are
powered on.
 When the storage system is powered on, the colors of the indicators vary with the port speeds.
For details, see the OceanStor Dorado5100 Storage System Installation Guide.
1
Switching On the External Power Sources
Switching on the external power sources of the devices in the following sequence: disk enclosures →
controller enclosure → switch (for SAN) → application server.
2
Pressing the Power Button on Either Controller Enclosure
3
Checking the Status Indicators on the Controller Enclosure (Rear View)
Power running/alarm
indicator
Link indicator of the 10
Gb iSCSI port
Link/speed indicator
of the 8 Gb FC port
Green on
Fan running/alarm
indicator
Link indicator of the
Green on
management network
port
-
Blue on
13
Running indicator of the
Green on
interface module
Link/speed indicator
Green on
of the 6 Gb SAS
expansion port
-
-
Green on
Blue on
-

Advertisement

Table of Contents
loading

Table of Contents