3. Adjust the temperature setpoint:
a. Press the up and down keys simultaneously for three (3) seconds, or until oPEr
(operations) menu appears on the right display; the first submenu shown in the left
display is Ai.
b. Press the up or down key to scroll through the available submenus; when the LooP
submenu appears in the left display, press the green advance key (circle arrows)
several times until the C .SP submenu is shown in the right display.
c. Use the up or down arrow key to set the desired temperature set point. Standard
factory set points are 226°F and 108°C.
d. Press the gray infinity key for two (2) seconds to return to the Home Page.
4. Adjust the temperature alarm setpoint:
a. Press the up and down keys simultaneously for three (3) seconds, or until oPEr
(operations) menu appears on the right display; the first submenu shown in the left
display is Ai.
b. Press the up or down key to scroll through the available submenus; when the ALM
submenu appears in the left display, press the green advance key (circle arrows)
several times until the A .hi submenu is shown in the right display.
c. Use the up or down arrow key to set the desired alarm set point. Factory
recommended alarm setpoints are 230°F and 110°C.
d. Press the gray infinity key for two (2) seconds to return to the Home Page.
Potential Fire Hazard! Replace fuses only with the same fuse type and ratings .
Electrical Shock Hazard! Disconnect all power before servicing .
Burn Hazard! Isolate sample and allow unit to cool before servicing . Degas chamber could be
full of water and burn operator when servicing .
General
Before every use:
ƒ Check all connectors, valves, fittings, and other components for signs of leakage.
Repair as required, using only the connections referenced in the installation section.
ƒ Check the resin column and note whether the color change has passed the line on the
column. If the color change has passed the line, replace the column or recharge with
new resin.
Replacing and Cleaning Analyzer Electrodes
Establish a routine schedule to replace and/or clean analyzer electrodes (refer to
manufacturer's literature).