STEPS FOR F4-4LTC INSTALLATION
The following steps should be used as guideline for installation of the F4-4LTC. All steps may not be
necessary in all applications.
1.
Set Jumpers for RTD or Thermocouple
2.
Install F4-4LTC in the CPU Base and Note the Slot Number
3.
Connect Temperature Sensors to TEMP Inputs
4.
Connect SSR Controller Outputs to SSRs
5.
Connect CT Inputs to Current Transformers
6.
Connect 24VDC Power Supply to F4-4LTC
7.
Power Up PLC and Initialize Dedicated V-Memory
8.
Initialize Loop Configuration V-Memory
9.
Tune Loops
CHAPTER 2: INSTALLATION AND WIRING
2.1