Agilent Technologies 7820A GC Site Preparation Manual page 33

Hide thumbs Also See for 7820A GC:
Table of Contents

Advertisement

Company Name
Company Address
Contact Information (name, phone / e-mail)
Comments
Manager responsible for site preparation
Site Readiness Certification
I have read and understand the 7820A GC Site Preparation
requirements, and certify that the site has been prepared for
instrument installation as described in this manual, including:
Adequate space and suitable supporting bench available
Adequate electrical power available at the correct voltages and
frequencies
Environmental control systems adequate to maintain a correct,
stable operating environment
Necessary supplies for instrument performance evaluation are
available, including solvents, helium carrier gas and other gases as
needed for your detectors, and printer paper
Adequate computer with LAN connectivity
User with administrative privileges on the computer
Appropriate personnel will be available during installation
I understand that delays due to inadequate site preparation could
cause loss of instrument use during the warranty period.
Return the completed form by:
FAX
See
Table 4
E-mail
See
Table 4
Contact your Agilent representative for assistance.
For more information, refer to the Agilent support page at
www.agilent.com/chem.
Agilent Technologies
on page 32
on page 32
Date

Advertisement

Table of Contents
loading

Table of Contents