Company Name
Company Address
Contact Information (name, phone / e-mail)
Comments
Manager responsible for site preparation
Site Readiness Certification
I have read and understand the 7820A GC Site Preparation
requirements, and certify that the site has been prepared for
instrument installation as described in this manual, including:
❑
Adequate space and suitable supporting bench available
❑
Adequate electrical power available at the correct voltages and
frequencies
❑
Environmental control systems adequate to maintain a correct,
stable operating environment
❑
Necessary supplies for instrument performance evaluation are
available, including solvents, helium carrier gas and other gases as
needed for your detectors, and printer paper
❑
Adequate computer with LAN connectivity
❑
User with administrative privileges on the computer
❑
Appropriate personnel will be available during installation
I understand that delays due to inadequate site preparation could
cause loss of instrument use during the warranty period.
Return the completed form by:
FAX
See
Table 4
E-mail
See
Table 4
Contact your Agilent representative for assistance.
For more information, refer to the Agilent support page at
www.agilent.com/chem.
Agilent Technologies
on page 32
on page 32
Date